Home / Compare bathroom remodel costs by size and scope
Bathroom cost comparison hub · model 2026.1
Use these national planning ranges to compare project shapes before choosing a detailed budget. Every range assumes professional installation and a standard finish; local market conditions can move the result.
Use these representative combinations to compare size, scope, finish, schedule, and main cost pressure in one place. Select “Adjust estimate” to model a different combination or open the most relevant guide for deeper planning.
| Bathroom size | Project scope | Finish level | Modeled cost range | Typical duration | Main cost drivers | Calculator or guide |
|---|---|---|---|---|---|---|
| Small · 35 sq ft | Cosmetic refresh | Budget | $8,000–$12,000 | 1–2 weeks | Minimum trade charges, stock vanity, paint, lighting | Small-bath guide → |
| Small · 35 sq ft | Full remodel | Standard | $15,500–$23,000 | 3–5 weeks | Waterproofing, fixture replacement, tight access | Small-bath guide → |
| Standard · 55 sq ft | Cosmetic refresh | Standard | $13,500–$20,000 | 1–3 weeks | Vanity, fixtures, lighting, surface repairs | Vanity guide → |
| Standard · 55 sq ft | Full remodel | Standard | $21,500–$32,000 | 3–6 weeks | Tile, plumbing, electrical, waterproofing | Adjust estimate → |
| Standard · 55 sq ft | Full remodel | Premium | $28,500–$42,500 | 4–7 weeks | Premium tile, custom glass, cabinetry, fixtures | Walk-in shower guide → |
| Large · 85 sq ft | Full remodel | Standard | $30,000–$45,000 | 4–7 weeks | More tile, double vanity, larger wet area | Primary-bath guide → |
| Large · 85 sq ft | Luxury rebuild | Premium | $67,000–$99,500 | 7–12+ weeks | Layout changes, custom shower, glass, cabinetry | Primary-bath guide → |
| Extra large · 120 sq ft | Full remodel | Premium | $54,000–$80,500 | 6–10 weeks | Multiple fixtures, extensive tile, custom storage | Plumbing guide → |
| Extra large · 120 sq ft | Luxury rebuild | Premium | $89,500–$133,000 | 8–14+ weeks | Structural coordination, plumbing moves, bespoke finishes | Adjust estimate → |
1–3 weeks
Same layout; selected fixtures and visible finishes.
3–6 weeks
Demolition; main fixtures, surfaces, plumbing and electrical updates.
6–12+ weeks
Layout work, custom elements, premium fixtures and finishes.
The model applies a Budget factor of 0.82, Standard at 1.00, and Premium at 1.34. Finish selection affects tile, cabinetry, fixtures, glass, hardware, and installation complexity; it does not describe workmanship quality. Use Budget for stock selections and limited customization, Standard for durable midrange products, and Premium for custom or specification-heavy work.
Use these focused guides when two project approaches appear similar but carry different scope, schedule, or installation risk.
These ranges exclude bathroom additions, financing, temporary accommodation, hazardous-material remediation, major structural work, and concealed damage beyond the modeled contingency. Compare contractor proposals against one written scope before making a decision.